FOA-PROCUREMENT OF TWO GENERATORS & CONSTRUCTION OF TWO NURSERIES IN RURAL DAMASCUS GOVERNORATE

Location: Akraba nursery - Airport Square nursery , Damascus ,Syria. Plot Area: 490 SQM. Client : FAO- Food and Agriculture Organization of the United Nations. Submission Date: 05/04/2019. KFA was responsible of the construction works of two green houses with the dimensions of (508 m) and (156 m) including delivering all the followings items : Steel arches , frames , pillars and doors with all accessories.Plastic covering sheets and shade nets.Heaters and thermostat Also KFA was responsible of providing and installing two generators , one for each nursery with all needed cabling and accessories works .

ICRC-REHABILITATION OF INDIVIDUAL HOUSES IN Al-ZABADANI (PHASE 1 & 2-100 HOUSES)

Location: Al-Zabadani , The Suburbs of Damascus . Plot Area: 3,000 SQM. Total built-up Area : 12,000 SQM. Client : ICRC- International Committee Of The Red Cross Submission Date: 2018 & 2019. KFA was respnsable of performing rehabilitation works for 100 houses in Al-Zabadani area in the suburbs of Damascus ,These rehabilitation works included the following : Internal walls & Ceiling .Wood Works. Aluminum Works. Glass. Electrical Devices. Warter & Sanitary Works. Maintenance Works.

SARBAN MOSQUE WORKS

Location: Maseef Salahuddin, Erbil-Iraq . Plot Area: 2,400 SQM. Client: Salahuddin Holding. Submission Date: 25/10/2017. Scope of Work: treating the water leakage at the roof areas and domes through performing civil works and then applying the suitable waterproofing materials from Koster. Civil Works for Roofs and Domes. Waterproofing Works for Roofs and Domes. Waterproofing Works for Facades. Waterproofing Works for Old Minaret. Waterproofing Works for Women Prayer Building. Waterproofing Works for Services Unit.

RT BANK WATERPROOFING WORKS

Location: 40 meter street (Gulan Street) , Erbil - Iraq. Plot Area: 1,200 SQM. Client: Salahuddin Holding. Submission Date: 30/04/2017. Scope of Work: treating the water leakage in the landscape and setbacks areas through performing civil works and then applying the suitable waterproofing materials from Koster.

PARK VIEW WATERPROOFIG WORKS

Location: Park View Complex , Erbil - Iraq. Plot Area: 60,000 SQM. Client : Salahuddin Holding. Submission Date: 2018. Scope of Work: treating the water leakage through performing civil works and then applying the suitable waterproofing materials from Koster for the following areas: 1- Underground Parking Roof (Central landscape area).  Gardens areas works. Water features areas works. Expansion Joints works. Pathway Works. Buildings’ Roofs Waterproofing Works. 2- Commercial building roof. 3- Residential building roof. 

FODDER FACTORY

Location: Karkouk Road, Kurdistan Region, Iraq Plot area: 4650 sq. m KFA was responsible for designing and constructing the factory which was divided into several functional spaces: • Large Storage Hall • Production Hall • Boiler Room • Compressor Room • Administrative Area

UNHCR CONSTRUCTION WORKS FOR OFFICE

Location: UNHCR Offices, Sweida, Syria Plot area: 475 sq. m KFA was responsible of renovating UNHCR offices in Sweida. The building consists of three floors: Basement, Ground Floor, and First Floor. KFA’s renovation works included the following items: Safe Haven: 1. Dismantling of the existing wall in front of the staircase and opening a new hall 2. Construct masonry wall with plaster and painting 3. Provide and install two metal doors and one wooden door

Garmian University

Client: LAND Consulting and Engineering Location : Garmian - Iraq The aim of the project is tracking water from « serawan» river to Garmian University. The project serves a capacity of 9000 people and consists of the following: 1- Intake 2- Water pumping station 3- Water treatment station 4- Water tanks, ground tanks and elevated tanks 5- Water networks 6- Drinking 7- Irrigation 8- Fire fighting

IOM Rehabilitation Project

Contractor: Natassico Consultant: KFA Date: Sep 2013 Location : Lattakia, Hama, Homs, Damascus - Syria The scope of project was rehabilitation works for 42 shelters including installation of external units (sandwich panels), with the related infrastructure, internal and external works. The studies and supervision included 4 cities in Syria, divided as the following: Damascus: 6 shelters Homs: 26 Shelters Lattakia : 1 shelter – Lattakia sport city Hama : 9 shelters The total number of beneficiaries: IDP was around 10,000 IDPs KFA prepared the design study with all related drawings, BOQ, Specs, cost estimates for shelters, including the technical assessment for all above mentioned shelters. In the construction phase, KFA was responsible for supervising and offering consultations through its professional team consisting of 15 engineers. The work includes daily and weekly reports, work progress percentage, daily pictures, in addition to technical reports.

UNHCR RENOVATION WORKS FOR KS3 BUILDING

Location: UNHCR Office, Opposite of al-Andalus Hospital, Kafarsouseh, Damascus, Syria Plot area: 330 sq. m Total built-up area: 1340 sq. m KFA was responsible of performing renovation works for KS3 building of UNHCR. The building consists of a ground floor, three floors, a basement, and a roof. KFA’s renovation works included: • For All Floors: Paint works, sanitary maintenance works, moisture treatment works, and instalment of new gypsum board partitions. The work also included providing electrical boards, air conditions, and doors. For Basement: Supplying and installing the Earthing system, casting concrete floors, and preparing shelter rooms. • For Roof: Insulation works, and solar system maintenance. KFA was also responsible of: • Executing: the reception area, 3 precast booths, asphalt ground for the parking area, and an overhead protection roof for the parking. • Security works: supplying and installing a general alarm system, fire detection system, fire extinguisher, and emergency plans and signs. • ITC works: network outlets and dual electrical outlets.